REPLACE HVAC - MUSEUM
Replace air handler and add parallel chilled water coils - museum. PROJECT COST: $231,000
REPLACE HVAC - LIBRARY
Replace air handler - library and public spaces. PROJECT COST: $140,000
REPLACE HVAC - OFFICES
Replace air handler - second floor offices. PROJECT COST: $118,000
REPLACE ROOF - MUSEUM
Replace/repair/recoat roof sections - museum rear section. PROJECT COST: $36,000
REPLACE ROOF - LIBRARY
Replace/repair/recoat roof sections - library. PROJECT COST: $84,000
EMERGENCY GENERATOR
Provide power to run basic services during blackouts. PROJECT COST: $30,000
EXTERIOR PROTECTIVE PAINTING
Gutters and trim: $10K; roof shileds: $20K. PROJECT COST: $30,000
DIGITIZE MEMBERSHIP RECORDS
Funds to digitize membership records dating back to 1943 to reduce storage and improve access. PROJECT COST: $15,000
PARKING LOT REPAIRS
Fix holes; recoat. PROJECT COST: $14,000
FLOOR REPLACEMENT IN BEN FRANKLIN EXHIBIT AREA
Fix concrete and replace floor covering. PROJECT COST: $10,000
REPAIR WALLS AND FLOOR AT SCHOOL
Earthquake damage. PROJECT COST: $6,000
IT DEPARTMENT FLOOR
Replace deteriorated floor tile.
REPLACE SIDEWALK IN FRONT OF SCHOOL
Uneven - it's a hazard, especially in winter. PROJECT COST: $2000
|
||
|
|||
|