TIMELY NEEDS CATALOG LIBRARY & RESEARCH CENTER | NATIONAL WATCH & CLOCK MUSEUM | EDUCATION | IT, PUBLISHING, FACILITIES & MAINTENANCE
General Needs including IT (computer, Internet, web), Publishing, Facilities, and Maintenance .
![]() Where Most Needed
![]() NAWCC
National Watch
& Clock Museum
Columbia, PA
|
![]() REPLACE HVAC - MUSEUM
Replace air handler and add parallel chilled water coils - museum. PROJECT COST: $231,000
![]() REPLACE HVAC - LIBRARY
Replace air handler - library and public spaces. PROJECT COST: $140,000
![]() REPLACE HVAC - OFFICES
Replace air handler - second floor offices. PROJECT COST: $118,000
![]() REPLACE ROOF - MUSEUM
Replace/repair/recoat roof sections - museum rear section. PROJECT COST: $36,000
REPLACE ROOF - LIBRARY
Replace/repair/recoat roof sections - library. PROJECT COST: $84,000
![]() EMERGENCY GENERATOR
Provide power to run basic services during blackouts. PROJECT COST: $30,000
![]() EXTERIOR PROTECTIVE PAINTING
Gutters and trim: $10K; roof shileds: $20K. PROJECT COST: $30,000
![]() DIGITIZE MEMBERSHIP RECORDS
Funds to digitize membership records dating back to 1943 to reduce storage and improve access. PROJECT COST: $15,000
![]() PARKING LOT REPAIRS
Fix holes; recoat. PROJECT COST: $14,000
![]() FLOOR REPLACEMENT IN BEN FRANKLIN EXHIBIT AREA
Fix concrete and replace floor covering. PROJECT COST: $10,000
![]() REPAIR WALLS AND FLOOR AT SCHOOL
Earthquake damage. PROJECT COST: $6,000
![]() IT DEPARTMENT FLOOR
Replace deteriorated floor tile.
![]() REPLACE SIDEWALK IN FRONT OF SCHOOL
Uneven - it's a hazard, especially in winter. PROJECT COST: $2000
![]() |
||
|
|||
|